Skip to content

Drafting Pond

The 20,000-gallon drafting pond features one dry hydrant and concrete drafting pads. In addition, two manifolds have been set up on the corners to allow for the connection of flowing lines that dump back into the pond and avoid having firefighters holding hand lines during training. All hose, valves, adapters, and drop tanks are stored in the pond container and under the canopy.

One of Two Pond Dry Hydrants
One of Two Pond Dry Hydrants
One of Three Pond Manifolds
One of Three Pond Manifolds
Pump Training
Pump Training
Drafting Operations with Tenders
Drafting Operations with Tenders

Scroll To Top