Skip to content

Drafting Pond

The 20,000-gallon drafting pond features two dry hydrants and concrete drafting pads to support all weather operations. In addition, three manifolds have been set up on the corners to allow for the connection of flowing lines that dump back into the pond an d avoid having Firefighters holding handlines during training. All hose, valves, adapters and drop tanks are stored at the pond container. A Student Canopy has also been built to support training.

One of Two Pond Dry Hydrants
One of Two Pond Dry Hydrants
One of Three Pond Manifolds
One of Three Pond Manifolds
Pump Training
Pump Training
Drafting Operations with Tenders
Drafting Operations with Tenders

Print Friendly, PDF & Email
Scroll To Top