Skip to content

Fire Department Connection (FDC)

In addition to the interior Standpipe in the Four Story Structure the Tower Structure has an exterior Standpipe that can be used for stretching hose on either the Tower Structure up to the next level and / or into the Four Story Structure. The Instructor can observe both the connection of the FDC and the connection of the standpipe from several vantage points.

External Standpipe System
External Standpipe System
Standpipe Connection on the 2nd Level
Standpipe Connection on the 2nd Level
FDC at the base of the Tower Structure
FDC at the base of the Tower Structure
Print Friendly, PDF & Email
Scroll To Top